Scope of Work for Redevelopment Projects:

A1. Preliminary Services (In case the bids are required to be called)

• Obtaining, scrutinizing relevant ownership documents, approved plans, etc.
• Assessment of the above and preparation of PROJECT FEASIBILITY REPORT (PFR), consisting of development area available, financial aspects for the benefit of the society.
• Preparing suitable “road map”/bid documents as per prevalent guidelines, specifications and tender documents for the bids to be called by the society.

A2. Preliminary Services (In case the society has already called bids directly)

Upon receipt of bids from the society, scrutinizing them on common platform, keeping the society’s interests as primary issue. Preparing “Comparison Statement”, mentioning each of the bids received, based on criteria like,
• Reputation of the bidder
• Past track record of similar works.
• Organizational set-up.
• Financial capabilities
• Bank references • Overall rationality
After due deliberations with the Committee of the Society about the above, presenting the same in more elaborate way to the “SPECIAL GENERAL BODY” for the final approval in selecting the Developer.

B. Planning And DesigningStage

• Coordinating with the Architects and Team of the Developer in all aspects like, planning, designing, specifications, list of amenities, value-added items, etc., to see that things work the best in favour of the society.
• Coordinating in preparation of necessary legal documents between the Developer and the Society.

C. Execution Stage

• As per scheme of supervision attached herewith, thorough watch on quality is kept, maintaining various check-lists, test reports, concrete pour slips, so on and so forth. Detailed Monthly Report is submitted to the society with all documents and records. At the time of final possession, each and every unit is inspected to see that work is completed to the satisfaction of the unit owner.

D. Handing Over Stage

Stringent check will be kept on the following –
• Completion certificate
• Occupation Certificate.
• Drainage and waste water connections / levels
• Formation of society along with the new members, keeping interest of original members towards Corpus Fund

Icon

38+

Years Of Experience
Icon

50+

Team Member
Icon

3M+

Sq.ft Redevelopment

Architectural Planning

Preparing Plans for The Society According to their needs and Specifications:- • Flats planning complying with DC rules and regulations as per society’s requirements to get the most benefit in terms of usage of carpet area.
• Planning of parking spaces with the number of parks as desired

Architectural Liaisoning​

Architectural liaisoning, also known as architectural coordination or architectural liaison, is a crucial aspect of the architectural and construction process.

Checking of Structural Designs​

Checking of Structural Design Prepared by The Developer using softwares:

Structural Design Parameters: • Loading: Dead Loads, Live Loads, Wind Loads and Earthquake Loads
• Grades of structural materials: concrete and steel reinforcement
• Type of foundation

Interior Designing

• Designing the interiors of the flats with Vastu Compliances.
• Discussing the designs and preparing 2D and 3D views for better understanding of the designs.
• Sourcing materials as per clients choice.
• Checking contractor’s Bills.
• Planning the project so as to complete the project within time limits

Legal Assistance

Helping the society in documentation and settling of drafts of the following:

1. Notices/Agenda for the Managing Committee meetings to be held pertaining to the project. 2. Notices/Agenda for the SGBM to be held pertaining to the project. 3. Appointment letter of the selected Developer. 4. MOU/LOI, if any, required for the project. 5. The Development Agreement with the required annexures. 6. Individual Agreements of the Members in respect of their new premises. 7. Powers of Attorney to be given to the selected Developers. 8. Bank Guarantee. 9. Indemnity Bonds.
Scope of Work for Redevelopment Projects:
OUR ESTEEMED CLIENTS

Shree Siddhivinayak Ganapati Temple at Prabhadevi, Mumbai

Lupin Limited Research Centre at Pune

Shri Vile Parle Kelvani Mandal at Vile Parle, Mumbai

CIDC Certified Vendors

State Bank of India

Brihanmumbail Municipal Corporation

New India Assurance Co. Ltd.

Central Bank of India

img
img
Award Wiining Firm

The Mission is to Provide The Best Services

Best Services And Optimum Results In Given Time Frame .